Match Production Machinery |
|
|
A complete range of match machinery |
|
|
Splints CBK2, CAB2 CED DAL, DAS GFP EFK5 DYS2 SF FZD5 GFM3 FIV2
|
|
| | |
|
| | |
|
|
Match line
JUL2+KEB6 HUF+KED4 FOD2
KL4 ROG2, ROM |
|
| | |
|
|
Packaging VAT, VAP VYB, VAV3 |
|
| | |
|
|
Head composition DBH250, DBH500 HCT500
|
|
|
Box making machinery |
|
|
|
|
Box straightening machine |
|
|
|
|
|
|
Strip creasing and friction painting machine |
|
|
|
|
|
|
Splint making machinery |
|
|
Splint veneer peeling machine |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Splint trim waste sorting machine |
|
|
|
|
Match making machinery |
|
|
Continuous machine (high-speed dipping machine) |
|
|
|
|
Box filling machine (automatic machine with 2x8 boxes per stroke) |
|
|
|
|
Box filling machine (automatic machine with 2x12 boxes per stroke) |
|
|
|
|
Box filling machine (automatic machine with 2x8 boxes per stroke) |
|
|
|
|
Packaging & material handling machinery |
|
|
|
|
|
|
|
|
Shrink wrapper (L-sealer)
|
|
|
|
|
|
|
|
|
|
|
Match machinery - Others
|
|
|
|
|
|
|
Head composition storage tank
|
|
|
Hering and Roller match machineryIn 1987 Arenco acquired the machine program of Roller Zündholzmaschinen GmbH and in 1998 the match making machinery business of Hering was acquired. We have the ability to provide full coverage services for spare parts, upgrade kits and technical service.
Second-hand machineryAs a complementary service we can offer you a range of second-hand machinery. For the customers wanting to keep down their investments, a purchase of used and upgraded machines can be an alternative. Arenco has long experience of making complete renovations of used machinery. The used machines can be offered in different conditions:
Fully renovated machine means that all worn components have been replaced. The machine can in most cases be updated to the same execution as that of a new machine. We give one year's guarantee - the same as for a new machine. Size parts are manufactured according to the customer's requirements. The prices are about 80% of the price of a new machine, but vary depending of the 'original' condition of the machine as well as the degree of upgrading and type of machine.
Overhauled in running conditions means that wearing parts and damaged parts have been replaced without upgrading. A test run is done before delivery. The prices may vary depending on the 'original' condition of the machine. |